Nansen Terrace, Leeds
November 23, 2015After been approached by a landlord who had bought a 4 bedroom back to back end terraced house who wanted to turn it into a 5 bed house of multiple occupancy, Christopher Construction set out to design and refurbish the property. Each room included an en suite and individual living space. The property also included a communal kitchen diner.